
C-TS422-2020 Questions Pass on Your First Attempt Dumps for SAP Certified Application Associate Certified
C-TS422-2020 Practice Test Pdf Exam Material
NEW QUESTION 82
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
There are 2 correct answers to this question.
- A. Simultaneous
- B. By usage probability
- C. 100% check
- D. First in first out (FIFO)
Answer: B,C
NEW QUESTION 83
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.
- A. Use a specific MRP type.
- B. Use a specific material group
- C. Use a specific MRP controller.
- D. Use a specific material status.
Answer: A,C
NEW QUESTION 84
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
- A. Forecast planning
- B. Consumption-based planning
- C. Material requirements planning
- D. Manual planning without check
Answer: B
NEW QUESTION 85
What must be used in the system to plan the requirements for different subcontractors separately?
- A. MRP areas
- B. Production versions
- C. Storage locations
- D. Planning plant
Answer: A
NEW QUESTION 86
For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.
- A. Production version
- B. Material
- C. Work center
- D. Plant
Answer: B,C
NEW QUESTION 87
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.
- A. SAP Field glass
- B. SAP Ariba
- C. SAP C/4HANA
- D. SAP SuccessFactors
- E. SAP Concur
Answer: A,B,E
NEW QUESTION 88
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named "W1904_1000_001". What does the suffix 001 in the resource name represent?
- A. Available capacity version
- B. Capacity category
- C. Number of individual capacities
- D. Work center category
Answer: B
NEW QUESTION 89
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Planning with final assembly (40)
- B. Planning without final assembly (50)
- C. Planning at assembly level (70)
- D. Make-to-order production (20)
Answer: B
NEW QUESTION 90
In the first step, you have created master recipes. In which sequence are the additional objects created?
- A. Process order Control recipe PI sheet Process message
- B. Control recipe Process order Process message PI sheet
- C. Process order Control recipe Process message PI sheet
- D. Control recipe Process order PI sheet Process message
Answer: A
NEW QUESTION 91
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
- A. Infinite resource and infinite strategy
- B. Finite resource and infinite strategy
- C. Infinite resource and finite strategy
- D. Finite resource and finite strategy
Answer: D
NEW QUESTION 92
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.
- A. In the MRP controller
- B. In the bill of materials (BOM)
- C. In the production order type
- D. In the routing
- E. In the production version
Answer: A,C,D
NEW QUESTION 93
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A. Fixed pegging (on/off)
- B. Direction (forward/backward)
- C. Finiteness level (0...1)
- D. Scheduling control (finite/infinite)
- E. Planning mode (bucket/sequence)
Answer: B,D,E
NEW QUESTION 94
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red
- B. Top of Red Base
- C. Top of Green
- D. Top of Yellow
Answer: C
NEW QUESTION 95
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Sales Order BOM
- B. Work Center BOM
- C. Class BOM
- D. Functional Location BOM
Answer: A,D
NEW QUESTION 96
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?
- A. Planned order or materialnumber
- B. Alphanumeric or quota arrangement
- C. Validity period or sales order
- D. Lot size or material cost
Answer: B
NEW QUESTION 97
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question.
- A. Production version data
- B. Warehouse number data
- C. MRP area data
- D. Storage location data
Answer: B,D
NEW QUESTION 98
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
- A. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
- B. The new operation is inserted at the desired time the previously dispatched operation is moved backward.
- C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- D. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
Answer: B
NEW QUESTION 99
What are some of the advantages of using Kanban? There are 2 correct answers to this question.
- A. Replenishments are based on centralized planning
- B. It is mostly accomplished by manual postings
- C. Replenishments are created close to the actual need
- D. It is a simplified form of production control
Answer: C,D
NEW QUESTION 100
In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Repetitive manufacturing profile
- B. Production cost collector
- C. Routing
- D. Production version
Answer: C,D
NEW QUESTION 101
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.
- A. Material master of the finished product
- B. Work center, in the production supply area
- C. BOM, in the item for the material
- D. Material master of the finished product
Answer: B,C
NEW QUESTION 102
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?
- A. When multiple operations are maintained for one product
- B. When multiple planned orders exists in one resource
- C. When alternate resourcesare used within one operation
- D. When multiple production versions are maintained for one product
Answer: C
NEW QUESTION 103
Which of the following is a valid sequence of the main activities in product on order processing?
- A. Creation, release, scheduling, material withdrawal, confirmation
- B. Creation, scheduling, release, material withdrawal, confirmation
- C. Creation, staging, release, material withdrawal, confirmation
- D. Creation, scheduling, release, variance calculation, confirmation
Answer: B
NEW QUESTION 104
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question.
- A. Confirmation profile
- B. Operation control key
- C. Production scheduling profile
- D. Scheduling margin key
Answer: B,C
NEW QUESTION 105
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.
- A. Automatic update of story boards
- B. Comparison of current data with historical data to identify trends
- C. Real time decision support
- D. Strategic analysis
Answer: C,D
NEW QUESTION 106
......
C-TS422-2020 [Oct-2022] Newly Released] Exam Questions For You To Pass: https://www.pass4leader.com/SAP/C-TS422-2020-exam.html
C-TS422-2020 Answers C-TS422-2020 Free Demo Are Based On The Real Exam: https://drive.google.com/open?id=1FdjvgGV1LoRzEqDJiGCCZxACnyiPM7qv