NEW QUESTION 82
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
There are 2 correct answers to this question.

  • A. Simultaneous
  • B. By usage probability
  • C. 100% check
  • D. First in first out (FIFO)

Answer: B,C

 

NEW QUESTION 83
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?Note:
There are 2 correct answers to this question.

  • A. Use a specific MRP type.
  • B. Use a specific material group
  • C. Use a specific MRP controller.
  • D. Use a specific material status.

Answer: A,C

 

NEW QUESTION 84
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Forecast planning
  • B. Consumption-based planning
  • C. Material requirements planning
  • D. Manual planning without check

Answer: B

 

NEW QUESTION 85
What must be used in the system to plan the requirements for different subcontractors separately?

  • A. MRP areas
  • B. Production versions
  • C. Storage locations
  • D. Planning plant

Answer: A

 

NEW QUESTION 86
For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.

  • A. Production version
  • B. Material
  • C. Work center
  • D. Plant

Answer: B,C

 

NEW QUESTION 87
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.

  • A. SAP Field glass
  • B. SAP Ariba
  • C. SAP C/4HANA
  • D. SAP SuccessFactors
  • E. SAP Concur

Answer: A,B,E

 

NEW QUESTION 88
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named "W1904_1000_001". What does the suffix 001 in the resource name represent?

  • A. Available capacity version
  • B. Capacity category
  • C. Number of individual capacities
  • D. Work center category

Answer: B

 

NEW QUESTION 89
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Planning with final assembly (40)
  • B. Planning without final assembly (50)
  • C. Planning at assembly level (70)
  • D. Make-to-order production (20)

Answer: B

 

NEW QUESTION 90
In the first step, you have created master recipes. In which sequence are the additional objects created?

  • A. Process order Control recipe PI sheet Process message
  • B. Control recipe Process order Process message PI sheet
  • C. Process order Control recipe Process message PI sheet
  • D. Control recipe Process order PI sheet Process message

Answer: A

 

NEW QUESTION 91
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?

  • A. Infinite resource and infinite strategy
  • B. Finite resource and infinite strategy
  • C. Infinite resource and finite strategy
  • D. Finite resource and finite strategy

Answer: D

 

NEW QUESTION 92
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the MRP controller
  • B. In the bill of materials (BOM)
  • C. In the production order type
  • D. In the routing
  • E. In the production version

Answer: A,C,D

 

NEW QUESTION 93
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Fixed pegging (on/off)
  • B. Direction (forward/backward)
  • C. Finiteness level (0...1)
  • D. Scheduling control (finite/infinite)
  • E. Planning mode (bucket/sequence)

Answer: B,D,E

 

NEW QUESTION 94
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Red
  • B. Top of Red Base
  • C. Top of Green
  • D. Top of Yellow

Answer: C

 

NEW QUESTION 95
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Sales Order BOM
  • B. Work Center BOM
  • C. Class BOM
  • D. Functional Location BOM

Answer: A,D

 

NEW QUESTION 96
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?

  • A. Planned order or materialnumber
  • B. Alphanumeric or quota arrangement
  • C. Validity period or sales order
  • D. Lot size or material cost

Answer: B

 

NEW QUESTION 97
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master Copier) to create new materials? There are 2 correct answers to this question.

  • A. Production version data
  • B. Warehouse number data
  • C. MRP area data
  • D. Storage location data

Answer: B,D

 

NEW QUESTION 98
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
  • B. The new operation is inserted at the desired time the previously dispatched operation is moved backward.
  • C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • D. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.

Answer: B

 

NEW QUESTION 99
What are some of the advantages of using Kanban? There are 2 correct answers to this question.

  • A. Replenishments are based on centralized planning
  • B. It is mostly accomplished by manual postings
  • C. Replenishments are created close to the actual need
  • D. It is a simplified form of production control

Answer: C,D

 

NEW QUESTION 100
In which data objects do you maintain the production line as the work center for repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. Repetitive manufacturing profile
  • B. Production cost collector
  • C. Routing
  • D. Production version

Answer: C,D

 

NEW QUESTION 101
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.

  • A. Material master of the finished product
  • B. Work center, in the production supply area
  • C. BOM, in the item for the material
  • D. Material master of the finished product

Answer: B,C

 

NEW QUESTION 102
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple operations are maintained for one product
  • B. When multiple planned orders exists in one resource
  • C. When alternate resourcesare used within one operation
  • D. When multiple production versions are maintained for one product

Answer: C

 

NEW QUESTION 103
Which of the following is a valid sequence of the main activities in product on order processing?

  • A. Creation, release, scheduling, material withdrawal, confirmation
  • B. Creation, scheduling, release, material withdrawal, confirmation
  • C. Creation, staging, release, material withdrawal, confirmation
  • D. Creation, scheduling, release, variance calculation, confirmation

Answer: B

 

NEW QUESTION 104
A warehouse manager likes to streamline the goods receipt (GR) process for production orders. Where can you enable the automatic GR? There are 2 correct answers to this question.

  • A. Confirmation profile
  • B. Operation control key
  • C. Production scheduling profile
  • D. Scheduling margin key

Answer: B,C

 

NEW QUESTION 105
What capabilities does SAP S/4HANA embedded analytics provide? There are 2 correct answers to this question.

  • A. Automatic update of story boards
  • B. Comparison of current data with historical data to identify trends
  • C. Real time decision support
  • D. Strategic analysis

Answer: C,D

 

NEW QUESTION 106
......