
C-TS422-2020 exam questions for practice in 2023 Updated 150 Questions
Updated Jul-2023 Premium C-TS422-2020 Exam Engine pdf - Download Free Updated 150 Questions
SAP C_TS422_2020 exam is an excellent way for professionals to demonstrate their proficiency in SAP S/4HANA production planning and manufacturing. Passing this certification exam will not only boost the candidate's career prospects but also enhance their knowledge and skills in this domain. If you are looking to establish yourself as an expert in SAP S/4HANA production planning and manufacturing, then this certification is definitely worth considering.
Earning the SAP C_TS422_2020 certification can help individuals advance their careers in production planning and manufacturing. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing certification is highly valued by employers as it demonstrates a deep understanding of SAP S/4HANA production planning and manufacturing processes. It also opens up new career opportunities and can lead to higher salaries.
SAP C_TS422_2020 certification exam is designed to help professionals advance their career in the field of manufacturing and production planning. SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing certification validates that a candidate has the skills and knowledge required to work with SAP S/4HANA and can help organizations optimize their manufacturing processes. Earning this certification can help professionals stand out in the job market and open up new career opportunities.
NEW QUESTION # 15
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The lot size range must be within the lot-size range of the assigned routing.
- B. The assigned routing must be a rate routing.
- C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
- D. The assigned routing must NOT have alternative sequences.
- E. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
Answer: A,C,E
NEW QUESTION # 16
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.
- A. Actual cost calculation
- B. Master data selection
- C. Capacity requirements determination
- D. Planning selection
- E. Order type determination
Answer: B,C,E
NEW QUESTION # 17
A customer is considering switching from order-related settlement to productrelated settlement. What are capabilities of cost collectors? There are 2 correct answers to this question.
- A. They can be created automatically during month end process.
- B. They can be used for repetitive manufacturing.
- C. They can be used for manufacturing with collective orders.
- D. They can be applied to make-to-stock production order.
Answer: B,D
NEW QUESTION # 18
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
- A. Engineering Change Record
- B. Bill of Material
- C. Routing
- D. Production Version
Answer: B,C,D
NEW QUESTION # 19
What determines whether the planned independent requirements in MRP consume other requirements?
- A. Requirements profile
- B. Requirements type
- C. Order type
- D. Consumption sequence procedure
Answer: B
NEW QUESTION # 20
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
- A. Insert operation
- B. Squeezing
- C. Scheduling working time only
- D. Find Slot
Answer: D
NEW QUESTION # 21
Which advanced functionality has been embedded in SAP S/4HANA? There are 3 correct answers to this question.
- A. Available-to-promise
- B. Backorder processing
- C. Demand planning
- D. Capacity planning
- E. Supply Network Planning
Answer: A,B,D
NEW QUESTION # 22
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.
- A. Scheduling control (finite/infinite)
- B. Planning mode (bucket/sequence)
- C. Direction (forward/backward)
- D. Fixed pegging (on/off)
- E. Finiteness level (0...1)
Answer: A,B,C
NEW QUESTION # 23
Your client is asking for your advice on material master numbering in SAP S/4HANA.
What do you need to consider? Note: There are 2 correct answers to this question.
- A. The number of leading zeros for internal numbers is client-specific.
- B. In Customizing you can decide by material type whether to use the long material number.
- C. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
- D. The display template for material numbers applies to all clients.
Answer: C,D
NEW QUESTION # 24
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Backflushing
- B. Kanban
- C. Transfer Order
- D. Picking list
Answer: D
NEW QUESTION # 25
What are the three layers in the SAP Best Practices Content for SAP S/4HANA? There are 3 correct answers to this question.
- A. Building Blocks
- B. Solution Package
- C. Scope Items
- D. Process Flows
Answer: A,B,C
Explanation:
E, Test Scripts
NEW QUESTION # 26
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination logic when a planned order is created?
- A. Costs
- B. Component availability
- C. Delivery date
- D. Quota arrangement
- E. Vendor rating
Answer: D
NEW QUESTION # 27
A material has been set up as a phantomassembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?
- A. Change the phantom item indicator for the phantom assembly in the BOM.
- B. Change the special procurement key of the phantom assembly in the BOM.
- C. Change the explosion type of the phantom assembly in the BOM.
- D. Change the item category of the phantom assembly in the BOM.
Answer: C
NEW QUESTION # 28
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
- A. Planning with final assembly (40)
- B. Planning without final assembly (50)
- C. Make-to-order production (20)
- D. Make-to-stock production (10)
Answer: A
NEW QUESTION # 29
What does a line hierarchy in repetitive manufacturing represent?
- A. A production line with an alternative sequence in the routing
- B. A production line with more than one work center
- C. A production line with a parallel sequence in the routing
- D. A production line with prioritized alternative work centers
Answer: B
NEW QUESTION # 30
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?
- A. By providing future demands from demand figures in the past
- B. By providing cross-plant planning and deployment
- C. By providing multilevel material requirements planning
- D. By providing replenishment proposals with exact times
Answer: D
NEW QUESTION # 31
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Production supply area
- B. Rate routing
- C. Replenishment strategy
- D. Control cycle
Answer: D
NEW QUESTION # 32
......
Authentic C-TS422-2020 Dumps With 100% Passing Rate Practice Tests Dumps: https://www.pass4leader.com/SAP/C-TS422-2020-exam.html
SAP C-TS422-2020 Real Exam Questions Guaranteed Updated Dump from Pass4Leader: https://drive.google.com/open?id=1FdjvgGV1LoRzEqDJiGCCZxACnyiPM7qv