The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103 mm (four trade size) sleeve be added?
Correct Answer: B
Vote an answer
A program has been established and preparation is complete. Component projects are planned as a part of which of the following?
Correct Answer: C
Vote an answer
The new performance financial system is delivered lo all business entities on time following a one-year implementation program After six months of utilization the global finance department one of the main beneficiaries of the program, determines that quality and level of granularity of the financial data is not sufficient for them to analyze the key performance indicators (KPIs) defined Additionally, the global finance department is missing the analytical tools required to understand the causes of discrepancies
To address these shortcomings the global finance department submits a request for a follow-up initiative through the process defined by which of the following documents?
To address these shortcomings the global finance department submits a request for a follow-up initiative through the process defined by which of the following documents?
Correct Answer: A
Vote an answer
An ICT distribution designer is providing labeling for a data center room number 2A, located on the second floor having 10 rows of cabinets.
Which of the following identifiers/labels would the designer attach to the bonding and grounding conductor between the first cabinet in the 6th row and the data center ground bar?
Which of the following identifiers/labels would the designer attach to the bonding and grounding conductor between the first cabinet in the 6th row and the data center ground bar?
Correct Answer: C
Vote an answer
What is the OPTIMAL lime in the construction process for ICT submittals to be reviewed by the ICT distribution designer?
Correct Answer: A
Vote an answer
An organization initiates an innovation program to deliver exceptional performance and benefits. After the program transition plan is in place and the implementation of a benefits sustainment plan starts the program manager discovers the program may be shut down due to lack of funding.
To ensure continued funding for the program, what should the program manager do next?
To ensure continued funding for the program, what should the program manager do next?
Correct Answer: A
Vote an answer
A program delivers incremental benefits but is far from closure. The company completes an acquisition and defines new strategic objectives.
What should the program manager do next?
What should the program manager do next?
Correct Answer: D
Vote an answer
A program manager is responsible for constructing a USS50 million building Management suggests it will take three years to complete. The program manager can select a design-build option to optimize the construction schedule to 1 5 years However heavy demand for steel is causing price increases and delivery delays. II this trend continues, it could take as long as 4.5 years to complete construction. You learn that a new technology can yield a definitive delivery schedule of 1 25 years
What is the expected time of delivery?
What is the expected time of delivery?
Correct Answer: C
Vote an answer
Program manager B leaves the program and program manager A takes over the program responsibilities Program manager A wants to ensure that all expected benefits of the program are realized.
What is used to assess the program cost/benefit justification?
What is used to assess the program cost/benefit justification?
Correct Answer: B
Vote an answer
When estimating an ICT distribution designer project timeline schedule based on the scope of work which two scheduling methods use network diagrams lo integrate logical activities and identify critical paths on the project? (Select two options.)
Correct Answer: A,E
Vote an answer
A program is in its execution phase when a component project manager suggests a potential change that could increase the financial benefit of the program. The program manager is hesitant to submit a change request, as it would extend the program schedule and require a scope change.
To whom should the change request be presented?
To whom should the change request be presented?
Correct Answer: A
Vote an answer
Stakeholders make ad-hoc requests on a routine basis. This causes duplication of reporting and communication gaps that affect the program's performance
To resolve this situation, which of the following must go through critical review and change"?
To resolve this situation, which of the following must go through critical review and change"?
Correct Answer: A
Vote an answer
A system integration approach of a BAS on to a LAN can usually reduce the cost of cabling-related changes by
Correct Answer: A
Vote an answer
The ICT distribution designer is hired to design a Telecommunications Room on the third floor of a building. The size of the floor is 20 m by 26 m (92 x 85 It).
What is to be the MINIMUM size of the TR?
What is to be the MINIMUM size of the TR?
Correct Answer: A
Vote an answer