Free UiPath UiPath-ARDv1 Practice Test & Real Exam Questions
A developer wants to assign a value to a two-dimensional array of strings named newArray. What expression can be used in the Assign activity?
Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
In UiPath Studio, what describes project validation and workflow analysis?
Correct Answer: B
Vote an answer
When requesting a work item from Orchestrator Queues using the Get Transaction Item activity, you need to specify the following:
Options are :
Options are :
Correct Answer: C
Vote an answer
Please choose the correct statement about automation processes.
Correct Answer: B
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
A developer is creating a process using the Dispatcher and Performer model. The Dispatcher uses the Bulk Add Queue Items activity to upload items to an Orchestrator queue. Which type of design is best-suited for the automation of this Dispatcher?
Correct Answer: C
Vote an answer
Which of the following activities searches for a UI element by using a position relative to a fixed element?
Correct Answer: B
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
A developer has two collections containing data:
1) A list of strings called listA that was initialized with 2 items
2) An array of strings called arrayB that was initialized with 2 items
How can both collections be combined into a single 4-item collection called results?
1) A list of strings called listA that was initialized with 2 items
2) An array of strings called arrayB that was initialized with 2 items
How can both collections be combined into a single 4-item collection called results?
Correct Answer: D
Vote an answer
Is there any way to hide the execution of one activity in the logs?
Options are :
Options are :
Correct Answer: A
Vote an answer
When debugging a process, you run in Debug mode and are paused at a breakpoint.
To quickly execute the activity with the breakpoint and proceed with the execution, which button should be clicked on the Execute tab of Studio?
To quickly execute the activity with the breakpoint and proceed with the execution, which button should be clicked on the Execute tab of Studio?
Correct Answer: A
Vote an answer
Which activities allow you to iterate through an array of strings?
Options are :
Options are :
Correct Answer: A,B,D
Vote an answer
