A project team for a home in a small town is pursuing LEED certification. The home is designed with the following site characteristics:
* The lot is square.
* Three sides of the square lot border undeveloped land.
* The previous home covering 78% of the lot is deconstructed and the new LEED home will be built in its place.
* One full side of the square lot borders a home that was built 10 years before the LEED project.
Compliance with which of the following options, if any, will qualify the home for Location and Transportation Credit, Site Selection?
* The lot is square.
* Three sides of the square lot border undeveloped land.
* The previous home covering 78% of the lot is deconstructed and the new LEED home will be built in its place.
* One full side of the square lot borders a home that was built 10 years before the LEED project.
Compliance with which of the following options, if any, will qualify the home for Location and Transportation Credit, Site Selection?
Correct Answer: A
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
A project has a 2,500 ft² (232 m²) roof, 200 ft² (18.58 m²) uncovered patio, 100 ft² (9 m²) walkway, and 800 ft² (74 m²) driveway. The designer has selected ENERGY STAR qualified roofing material for 100% of the roof and open grid pavers (with 30% grass) for the patio and walkway. The driveway is gray concrete with an SR of 0.20. What is the percentage of non-absorptive hardscape material, rounded to the nearest whole number (if necessary)?
Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
The owner is considering a fireplace in a new house and is pursuing LEED for Homes certification. Which type of fireplace, if any, should be installed in order to achieve the maximum credit for Indoor Environmental Quality Credit, Enhanced Combustion?
Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
The Home Energy Rating System (HERS) Index, which measures the energy efficiency of a home, was developed by the:
Correct Answer: D
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
Which of the following written materials must be provided to a new home occupant to comply with Energy and Atmosphere Prerequisite, Education of the Homeowner, Tenant or Building Manager?
Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
How is credit earned under Regional Priority Credit, Regional Priority when the credit has multiple thresholds?
Correct Answer: A
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
The project team is planning trades training to meet requirements for the Integrative Process Credit, Option 2:
Trades Training. How many hours are required to earn this credit?
Trades Training. How many hours are required to earn this credit?
Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
Which of the following power needs requires special consideration at the design phase?
Correct Answer: D
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
One strategy to help achieve Location and Transportation Credit: Community Resources in a multi-family building is to provide:
Correct Answer: D
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
After the HVAC contractor has completed the rough-in installation of all air handling equipment, what step should be taken to achieve Indoor Environmental Quality Credit, Contaminant Control during construction?
Correct Answer: A
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).