Free SMRP CMRP Practice Test & Real Exam Questions
Which of the following most effectively makes up the members of a Manufacturing Team?
Correct Answer: B
Vote an answer
Ratio of Replacement Asset Value ($) to Craft-Wage Head Count = RAV ($) ÷ Craft-Wage Headcount
Correct Answer: D
Vote an answer
The amount of time an asset is actively producing a product or providing a service. It is the actual running time.
Correct Answer: B
Vote an answer
% = [Condition Based Maintenance Cost ($) ÷ Total Maintenance Cost ($)] × 100
Correct Answer: C
Vote an answer
O&M → RCM Methodology can't be used effectively on new systems
being designed. (t/F)
being designed. (t/F)
Correct Answer: B
Vote an answer
One or more tasks necessary to retain an item in or restore it to a specified operating condition. A maintenance action includes corrective, as well as preventative and predictive maintenance tasks that interrupt the asset function.
Correct Answer: A
Vote an answer
Systems Covered by Criticality Analysis (%) = [Number of Critical Systems (for which a criticality analysis has been performed) ÷ Total Number of Systems] × 100
Correct Answer: B
Vote an answer
The amount of time an asset is idle or waiting to run. It is the sum of the times when there is no demand, feedstock or raw material and other administrative idle time (e.g. not scheduled for production).
Correct Answer: B
Vote an answer
Work done to restore the function of an asset after failure or when failure is imminent.
Correct Answer: A
Vote an answer
Accounts receivable turnover is calculated by dividing net credit sales by:
Correct Answer: A
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
The metric is the average downtime required to restore an asset or component to its full operational capabilities. MDT includes the time from failure to restoration of an asset or component.
Correct Answer: A
Vote an answer