Free Nutanix NCSC-Level-1 Practice Test & Real Exam Questions
A consultant needs to verify the make and model of the systems that will be imaged with Foundation. The consultant does not have the Bill of Materials (BOM) available to review.
When should the consultant verify the make and model to prepare for the cluster deployment?
When should the consultant verify the make and model to prepare for the cluster deployment?
Correct Answer: A
Vote an answer
In a 20-node ESXi deployment, the customer needs additional resiliency to survive the loss of two nodes concurrently.
Which configuration should the consultant use to ensure that the appropriate resources are available?
Which configuration should the consultant use to ensure that the appropriate resources are available?
Correct Answer: D
Vote an answer
A customer is deploying Nutanix AHV clusters over hundreds of remote sites worldwide. Prism Central will be used to centrally manage all clusters. Customer security policy requires the use of MS Active Directory (AD).groups to authenticate all network devices.
Which method should be consultant use to meet the requirements?
Which method should be consultant use to meet the requirements?
Correct Answer: C
Vote an answer
A consultant needs to review a customer's switch port configuration to identify any issues. Other customer requirements are as follows:
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?
* Leverage LACP
* Native VLAN will not be used
* Use Multiple Upstream switches
* Use VLANs 20-25 and 30
* LACP Fallback has been Enabled
* vPC or MLAG has been configured
What must be included in a configuration in order to meet these requirements?
Correct Answer: D
Vote an answer
For a new AHV cluster installation, a customer has 20 NX-8155-G6 nodes with quad port SFP NICs.
The customer wants to meet the following guidelines:
* Take advantage of all available 10GbE links
* Achieve maximum throughput per VM
* Use of redundant ToR switches
* Fastest reconvergence during link failure
How should the load balancing be configured on the host?
The customer wants to meet the following guidelines:
* Take advantage of all available 10GbE links
* Achieve maximum throughput per VM
* Use of redundant ToR switches
* Fastest reconvergence during link failure
How should the load balancing be configured on the host?
Correct Answer: A
Vote an answer
A consultant is onsite with a customer running Foundation VM (FVM) and discovers that there is no connectivity between the FVM and their laptop. The consultant verifies the following:
* The consultant's laptop and Nutanix nodes are plugged into a flat switch.
* The laptop, switch and nodes are plugged into supported power supplies.
* The laptop network adapters and FVM are configured with their corresponding IP addresses.
What is the cause for the connectivity failure to the FVM?
* The consultant's laptop and Nutanix nodes are plugged into a flat switch.
* The laptop, switch and nodes are plugged into supported power supplies.
* The laptop network adapters and FVM are configured with their corresponding IP addresses.
What is the cause for the connectivity failure to the FVM?
Correct Answer: D
Vote an answer
A consultant is using the Foundation applet to create a cluster. During the process the consultant refreshes the progress bar web page and is concerned when nothing loads.
What should the consultant do to verify that Foundation has completed successfully?
What should the consultant do to verify that Foundation has completed successfully?
Correct Answer: B
Vote an answer
A Nutanix cluster has 10TB usable storage. The customer wants to create a 100GB datastore for ISO images to eliminate too much storage being consumed by unnecessary images.
Which setting should be used to accomplish this goal?
Which setting should be used to accomplish this goal?
Correct Answer: D
Vote an answer