  • Exam Code/Number: A2010-569
  • Exam Name/Title: Assess: IBM Tivoli Workload Scheduler V8.6 Implementation
  • Certification Provider: IBM
  • Corresponding Certification: IBM Certified Deployment Professional
  • Exam Questions: 134
  • Updated On: Aug 09, 2026
If a job stream is scheduled to run daily, which FOLLOWS matching criteria should be specified to ensure the previous day instance has completed successfully before today's can run?
Correct Answer: C Vote an answer
An administrator wants to recover a production plan with a new production plan that remembers what has already run today. Which command should be run first?
Correct Answer: D Vote an answer
A user runs Reset Plan -scratch on a master domain manager (MDM). runs JnextPian, and then immediately submits a predefined job stream with jobs on the MDM. No jobs in the job stream start on the MDM.
What will allow jobs to start?
Correct Answer: A Vote an answer
What are two causes of a job stream that has an internal status of STUCK? (Choose two.)
Correct Answer: C,D Vote an answer
What are the three valid security level settings when configuring a workstation for SSL? (Choose three.)
Correct Answer: A,B,F Vote an answer
A user has installed an IBM Tivoli Workload Scheduler V8.6 (TWS) master domain manager (MDM) on their own computer. Their computer is connected to the production network. The user has copied the workstation definitions from the production MDM to their own database. How can this user's TWS master be prevented from connecting to the production agents and initializing them with their own production plan?
Correct Answer: A Vote an answer
Which option in a job stream definition requires manual intervention before jobs launch?
Correct Answer: D Vote an answer
A user wants to access the new features of IBM Tivoli Workload Scheduler V8.6 as soon as each workstation is upgraded. Which upgrade strategy should the user implement?
Correct Answer: A Vote an answer