Which two of the following may the ICT distribution designer need to provide in order to identify the BEST solutions for the client's need? (Select two options.)
Correct Answer: C,D Vote an answer
An ICT distribution designer is designing a backbone cabling network that is specified for a campus network including several links approaching 2000 m (6562 It) and data rates of 100 Gb/s
What optical fiber type(s) should be used?
Correct Answer: B Vote an answer
Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)
Correct Answer: A,D Vote an answer
The above performance report shows the earned value (EV) analysis for a program.

The program director performs a high-level analysis and must present a summary narrative to the steering committee.
What do the current findings show?
Correct Answer: C Vote an answer
For a six story building (plus a basement) each of the six floors has a useable area of =3716 m2 (40.000 ft2) There are two riser systems, each serving halt of the useable area on each Moor What are the sleeves quantity and configuration required from fifth floor to sixth floor?
Correct Answer: C Vote an answer
Alter a company's senior executive management meeting the CEO issues a mandate to automate a new-client on-boarding process that would effectively eliminate the current manual paper-based process. The assigned program sponsor selects a program manager
Both the program sponsor and the program manager must ensure that the program charier contains which of the following?
Correct Answer: A Vote an answer
A MINIMUM separation distance of 305 mm (12 in) between telecommunication cables and power cables with EMI exceeding 5 kVA is acceptable in which of the following cases?
Correct Answer: B Vote an answer
Based on the estimated work area size, what is the MAXIMUM number of work areas that a telecommunications enclosure shall serve?
Correct Answer: D Vote an answer
Using an earth ground resistance tester, what is the recommended MAXIMUM value for resistance between any two points along the entire length of a bonding or grounding conductor (not including the earth electrode system)?
Correct Answer: A Vote an answer
An IT-related program has a critical team in a region experiencing a crisis. Due to uncertainty about the region's changing environment a company's senior leadership asks the program manager to decrease dependencies on the critical team that should the program manager do to mitigate the Impacts of this request?
Correct Answer: A Vote an answer
A new program is comprised of four component projects. The program manager must assign project managers to each of the tour projects. There are eight potential project managers to consider.
What should the program manager do before assigning the project managers?
Correct Answer: C Vote an answer
What is the RECOMMENDED bend radius of a conduit with an internal diameter of 51 mm (2 in)?
Correct Answer: D Vote an answer
What is the derating factor for a 24 AWG (0.51 mm) stranded cords?
Correct Answer: B Vote an answer
A program manager has a multiple-project program that is scheduled to be completed by year's end. During the program delivery phases of the protects several mandatory changes are identified that would extend the program's completion date
What is the next step for the program manager?
Correct Answer: D Vote an answer