Free BICSI RCDDv15 Practice Test & Real Exam Questions

  • Exam Code/Number: RCDDv15
  • Exam Name/Title: BICSI Registered Communications Distribution Designer - RCDD v15
  • Certification Provider: BICSI
  • Corresponding Certification: BICSI Certification
  • Exam Questions: 320
  • Updated On: Jul 07, 2026
Placement of a buried OSP pathway in public Rights of Way may require a permit based on which of the following?
Correct Answer: C Vote an answer
The chief executive officer (CEO) informs the program manager that the delivery dale for protect A must be compressed by two months to accommodate market needs Project A relies upon deliverables from projects B and C.
Which of the following should the program manager do first?
Correct Answer: C Vote an answer
What is the MAIN concern with a poke-thru installation?
Correct Answer: D Vote an answer
What's the MINIMUM depth of a trench from top of the cable/conduit to final grade? (Select two options.)
Correct Answer: B,C Vote an answer
In a PON deployment, which active device is installed at the work area?
Wireless access point
Correct Answer: A Vote an answer
Conducted coupling may affect electronic devices primarily through which two of the following means'? (Select two options.)
Correct Answer: A,C Vote an answer
During the design phase, drawings for ICT communications spaces should be reviewed for Standards compliance and
Correct Answer: A Vote an answer
A program governance board mandates that phase gate reviews must be held so each component project can be reviewed and individually authorized to proceed to the next phase Tracking and reporting of actual benefits realized is one part of the review
What is the other part of the review"?
Correct Answer: D Vote an answer
XYZ Company hires you to make its transitioning procedure more effective in meeting close-out requirements. You review XYZ's transitioning procedures to eliminate any that do not belong in the close-out phase.
Which of the following procedures should you removed?
Correct Answer: A Vote an answer
Which of the following serves as a guiding principle for a program manager when preparing a program work breakdown structure?
Correct Answer: D Vote an answer
Which two of the following types of metallic conduit REQUIRE threaded couplings? (Select two options.)
Correct Answer: A,B Vote an answer
For a backbone distribution system serving a usable floor space of 8,920 m2 (96,000 ft2), the MINIMUM slot area to be used for this back bone is
Correct Answer: A Vote an answer
One interior TTY must be provided at locations defined as public accommodations with ________ or more pay telephones.
Correct Answer: E Vote an answer
When designing for horizontal pathways in an environment that requires fire-stopping for penetrating a rated wall, what is the MAXIMUM till ratio for telecommunications cabling in a cable tray?
Correct Answer: A Vote an answer