Easily To Pass New C_TS422_2504 Verified & Correct Answers [Apr 24, 2026 [Q10-Q28]

Share

Easily To Pass New C_TS422_2504 Verified & Correct Answers [Apr 24, 2026

Free C_TS422_2504 Exam Files Downloaded Instantly

NEW QUESTION # 10
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

  • A. The same batch management level is used.
  • B. The same base unit of measure is used.
  • C. The same account category is used.
  • D. The quantity and value updates are the same.

Answer: B,D


NEW QUESTION # 11
How do you model a production line in repetitive manufacturing?

  • A. As awork center
  • B. Asa
  • C. Asan operation
  • D. routing
  • E. As a resource network

Answer: A


NEW QUESTION # 12
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.

  • A. Create by order release
  • B. Create without material
  • C. Create in Kanban process
  • D. Convert a purchase requisition

Answer: B,C


NEW QUESTION # 13
You use planning strategy Finite Scheduling with Reverse want to allow scheduling in the past. How can you parameterize this in the strategy profile?

  • A. Specify a negative PP/DS horizon.
  • B. Specify a negative planning horizon.
  • C. Specify a negative opening period.
  • D. Specify a negative offset time.

Answer: D


NEW QUESTION # 14
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.

  • A. Past sales order quantities
  • B. Past production planning quantities
  • C. Market intelligence
  • D. Past quotation quantities
  • E. One-off events

Answer: A,C,E


NEW QUESTION # 15
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track use this information in all areas of logistics?

  • A. Engineering change management
  • B. Process order management
  • C. Batch management
  • D. Quality management

Answer: C


NEW QUESTION # 16
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?

  • A. When multiple planned orders are scheduled in parallel on one resource
  • B. When several operations are maintained for one product
  • C. When alternative resources are used within one operation
  • D. When several production versions are maintained for one product

Answer: C


NEW QUESTION # 17
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Lot size
  • B. BOM header status
  • C. Manufacturing date
  • D. BOM component status

Answer: A,C


NEW QUESTION # 18
What does the material type influence?
Note: There are 2 correct answers to this question.

  • A. Which number range interval the material number comes from
  • B. Which document types and class categories are allowed
  • C. Whether value changes to financial accounting stock accounts are updated
  • D. Which plant-specific and plant-independent statuses are allowed

Answer: A,C


NEW QUESTION # 19
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. By material type
  • B. By material status
  • C. By plant
  • D. By change number

Answer: A,C


NEW QUESTION # 20
What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Quantity
  • B. Status
  • C. Scrap percentage
  • D. Installation point

Answer: A,D


NEW QUESTION # 21
How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private Edition? Note: There are 3 correct answers to this question.

  • A. Use stock transfer reservations for stock transfer.
  • B. Use purchase orders for external procurement.
  • C. Use purchasing costs for automated source prioritization.
  • D. Use run schedule quantities for inhouse production.
  • E. Use quotations for internal external procurement.

Answer: A,B,D


NEW QUESTION # 22
For a production version to be valid consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. The consistency check must be performed.
  • B. The assigned routing bill of material (BOM) must be valid in the entire validity period.
  • C. The assigned routing bill of material (BOM) must have the same validity period.
  • D. The lot size range must be within the lot size range of the assigned routing.
  • E. The deletion flag must NOT be set for the bill of material (BOM) or the routing.

Answer: B,D,E


NEW QUESTION # 23
For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.

  • A. In orderrelated COC individual production orders do NOT have cost segments.
  • B. Orderrelated COC is beneficial in a flexible production environment.
  • C. Productrelated COC is used in manufacturing for coproducts.
  • D. In productrelated COC all costs are debited credited to a product cost collector.

Answer: B,D


NEW QUESTION # 24
How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.

  • A. Batch record
  • B. Digital signature
  • C. Approved resources
  • D. Recipe approval
  • E. GMPcompliant flag

Answer: A,B,D


NEW QUESTION # 25
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.

  • A. Select a special explosion type inside the material BOM (bill of material)
  • B. Select a special explosion type inside the material master
  • C. Select a special procurement type inside the material master
  • D. Select a special procurement type inside the material BOM (bill of material)

Answer: C,D


NEW QUESTION # 26
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.

  • A. Bill of material
  • B. Routings
  • C. Production order
  • D. Work center

Answer: A,B


NEW QUESTION # 27
How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

  • A. By capacity planning
  • B. By mass processing
  • C. By order confirmation
  • D. By order release

Answer: B,D


NEW QUESTION # 28
......

100% Pass Guaranteed Free C_TS422_2504 Exam Dumps: https://www.pass4leader.com/SAP/C_TS422_2504-exam.html

Verified & Latest C_TS422_2504 Dump Q&As with Correct Answers: https://drive.google.com/open?id=1GjzLO0z6V9nuE9AWCh4CIgP0w5YgziMb