
Easily To Pass New C_TS422_2504 Verified & Correct Answers [Apr 24, 2026
Free C_TS422_2504 Exam Files Downloaded Instantly
NEW QUESTION # 10
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.
- A. The same batch management level is used.
- B. The same base unit of measure is used.
- C. The same account category is used.
- D. The quantity and value updates are the same.
Answer: B,D
NEW QUESTION # 11
How do you model a production line in repetitive manufacturing?
- A. As awork center
- B. Asa
- C. Asan operation
- D. routing
- E. As a resource network
Answer: A
NEW QUESTION # 12
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.
- A. Create by order release
- B. Create without material
- C. Create in Kanban process
- D. Convert a purchase requisition
Answer: B,C
NEW QUESTION # 13
You use planning strategy Finite Scheduling with Reverse want to allow scheduling in the past. How can you parameterize this in the strategy profile?
- A. Specify a negative PP/DS horizon.
- B. Specify a negative planning horizon.
- C. Specify a negative opening period.
- D. Specify a negative offset time.
Answer: D
NEW QUESTION # 14
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. Past sales order quantities
- B. Past production planning quantities
- C. Market intelligence
- D. Past quotation quantities
- E. One-off events
Answer: A,C,E
NEW QUESTION # 15
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track use this information in all areas of logistics?
- A. Engineering change management
- B. Process order management
- C. Batch management
- D. Quality management
Answer: C
NEW QUESTION # 16
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?
- A. When multiple planned orders are scheduled in parallel on one resource
- B. When several operations are maintained for one product
- C. When alternative resources are used within one operation
- D. When several production versions are maintained for one product
Answer: C
NEW QUESTION # 17
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Lot size
- B. BOM header status
- C. Manufacturing date
- D. BOM component status
Answer: A,C
NEW QUESTION # 18
What does the material type influence?
Note: There are 2 correct answers to this question.
- A. Which number range interval the material number comes from
- B. Which document types and class categories are allowed
- C. Whether value changes to financial accounting stock accounts are updated
- D. Which plant-specific and plant-independent statuses are allowed
Answer: A,C
NEW QUESTION # 19
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. By material type
- B. By material status
- C. By plant
- D. By change number
Answer: A,C
NEW QUESTION # 20
What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Quantity
- B. Status
- C. Scrap percentage
- D. Installation point
Answer: A,D
NEW QUESTION # 21
How can you set up the supply source for the Kanban process in SAP S/4HANA Cloud Private Edition? Note: There are 3 correct answers to this question.
- A. Use stock transfer reservations for stock transfer.
- B. Use purchase orders for external procurement.
- C. Use purchasing costs for automated source prioritization.
- D. Use run schedule quantities for inhouse production.
- E. Use quotations for internal external procurement.
Answer: A,B,D
NEW QUESTION # 22
For a production version to be valid consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
- A. The consistency check must be performed.
- B. The assigned routing bill of material (BOM) must be valid in the entire validity period.
- C. The assigned routing bill of material (BOM) must have the same validity period.
- D. The lot size range must be within the lot size range of the assigned routing.
- E. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
Answer: B,D,E
NEW QUESTION # 23
For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?
Note: There are 2 correct answers to this question.
- A. In orderrelated COC individual production orders do NOT have cost segments.
- B. Orderrelated COC is beneficial in a flexible production environment.
- C. Productrelated COC is used in manufacturing for coproducts.
- D. In productrelated COC all costs are debited credited to a product cost collector.
Answer: B,D
NEW QUESTION # 24
How can you support a GMP (Good Manufacturing Practice) compliant production process? Note: There are 3 correct answers to this question.
- A. Batch record
- B. Digital signature
- C. Approved resources
- D. Recipe approval
- E. GMPcompliant flag
Answer: A,B,D
NEW QUESTION # 25
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Select a special explosion type inside the material BOM (bill of material)
- B. Select a special explosion type inside the material master
- C. Select a special procurement type inside the material master
- D. Select a special procurement type inside the material BOM (bill of material)
Answer: C,D
NEW QUESTION # 26
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Bill of material
- B. Routings
- C. Production order
- D. Work center
Answer: A,B
NEW QUESTION # 27
How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.
- A. By capacity planning
- B. By mass processing
- C. By order confirmation
- D. By order release
Answer: B,D
NEW QUESTION # 28
......
100% Pass Guaranteed Free C_TS422_2504 Exam Dumps: https://www.pass4leader.com/SAP/C_TS422_2504-exam.html
Verified & Latest C_TS422_2504 Dump Q&As with Correct Answers: https://drive.google.com/open?id=1GjzLO0z6V9nuE9AWCh4CIgP0w5YgziMb