Availability is the percentage of the time that the asset is actually operating (uptime) compared to when it is scheduled to operate. This is also called operational availability.
Correct Answer: B
Vote an answer
Total expenditures for maintenance labor (including maintenance performed by operators, e.g., total productive maintenance (TPM), materials, contractors, services and resources. Include all maintenance expenses for outages, shutdowns or turnarounds, as well as normal operating times. Include capital expenditures directly related to end-of-life machinery replacement
Correct Answer: B
Vote an answer
A set of interrelated or interacting elements. In the context of
dependability, a system will have the following: a defined purpose expressed in terms of required functions, stated conditions of operation and defined boundaries. → Systems Covered by Criticality Analysis formula
dependability, a system will have the following: a defined purpose expressed in terms of required functions, stated conditions of operation and defined boundaries. → Systems Covered by Criticality Analysis formula
Correct Answer: A
Vote an answer
Replacement Asset Value (RAV) of the assets being maintained at the plant divided by the craft-wage employee headcount
Correct Answer: B
Vote an answer
What relationship should Maintenance and Reliability Teams have with and suppliers for optimum effectiveness?
Correct Answer: C
Vote an answer
The metric is the amount of money spent annually maintaining assets, divided by the Replacement Asset Value (RAV) of the assets being maintained, expressed as a percentage
Correct Answer: C
Vote an answer
This metric is the ratio of the benefit to the cost of training internal maintenance employees.
Correct Answer: B
Vote an answer
(%) = [Preventive Maintenance Cost ($) ÷ Total Maintenance Cost ($)] ×
100 → Corrective Maintenance Hours Formula
100 → Corrective Maintenance Hours Formula
Correct Answer: A
Vote an answer
the percentage of total maintenance labor hours used to restore equipment to a functional state after a failure or when failure is imminent → Corrective Maintenance Cost
Correct Answer: A
Vote an answer
The rate at which an asset is designed to produce product during a designated time period or the demonstrated best sustained rate, whichever is higher.
Correct Answer: C
Vote an answer
(%) = (Corrective Maintenance Cost ×100) ÷ Total Maintenance Cost
Correct Answer: B
Vote an answer
Which approaches to costing may use a standard-cost system?
Correct Answer: B
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).