During the preparation of the construction documents, it was noted that the survey inaccurately located the property line. Consequently, the parking layout had to be redesigned to fit within the corrected property boundary.
The architect's additional costs and associated delay are the responsibility of which one of the following parties?
The architect's additional costs and associated delay are the responsibility of which one of the following parties?
Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
A geotechnical report for a public project reveals a previously unknown condition and indicates that there is rock directly beneath the existing grade. The proposed building will now require a shallow foundation. The chosen location was the result of a three-year process evaluating multiple potential sites.
Which actions should the architect take next as a result of the geotechnical report results? Check the three that apply.
Which actions should the architect take next as a result of the geotechnical report results? Check the three that apply.
Correct Answer: C,E,F
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
Near the end of a routine job site visit, the architect begins to assemble notes. The owner's representative then arrives on site unexpectedly. The architect, owner's representative, and contractor discuss and resolve several outstanding project issues. The architect begins writing correspondence to distribute to the project team when the architect returns to the office.
In addition to a Meeting Record, which of the following documents should the architect create?
In addition to a Meeting Record, which of the following documents should the architect create?
Correct Answer: B
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
An architectural firm is developing construction documents (CDs) for a multi-story manufacturing facility.
The project requirements include high-volume ventilation and filtration air distribution systems and heavy floor load design to accommodate the manufacturing equipment and processes. The project manager (PM) is planning for coordination and constructability review of the project documents at 80% CDs.
What actions should the PM take to ensure an effective quality control review? Check the three that apply.
The project requirements include high-volume ventilation and filtration air distribution systems and heavy floor load design to accommodate the manufacturing equipment and processes. The project manager (PM) is planning for coordination and constructability review of the project documents at 80% CDs.
What actions should the PM take to ensure an effective quality control review? Check the three that apply.
Correct Answer: C,E,F
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
On a private project, which of the following actions by a subcontractor who had not been paid by the contractor is most likely to be an effective collection measure?
Correct Answer: A
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
What is the best method for an architect to reduce liability related to unknown site conditions?
Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
What is the primary purpose of a punch list?
Correct Answer: B
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
An architect is working on a design-build project for a large skyscraper. The architect has completed a conceptual design, finalized the contracts, and hired consultants. The schematic design phase is set to begin in one week.
Which items or tasks are important for the architect to complete during this time? Check the three that apply.
Which items or tasks are important for the architect to complete during this time? Check the three that apply.
Correct Answer: B,C,E
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).