Your organization uses a Microsoft Visual Studio Team Foundation Server (TFS) 2010 environment on a Windows Server 2008 R2 SP1 server.
The Windows Server 2008 R2 SP1 server has a SQL Server 2008 R2 environment, as well as a Microsoft Office SharePoint Foundation 2010 environment. Your organization wants to perform an in-place upgrade to the 2013 version of TFS.
You need to prepare the environment to meet the minimum requirements for the upgrade.
What should you do?
Correct Answer: A Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
DRAG DROP
You are using Microsoft Test Manager (MTM) to manage your testing efforts.
You plan to identify which tests are impacted by changes to the code.
You need to view a list of recommended tests from the Recommended tests view.
What should you do? (To answer, move the three appropriate actions from the list of
actions to the answer area and arrange them in the correct order.)
Correct Answer:
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Your developers use Visual Studio 2012.
Developers frequently work from locations where there is no network connection.
You need to ensure that developers are able to easily compare their current changes to the last version retrieved from version control.
Which type of workspace should you configure?
Correct Answer: C Vote an answer
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server. Developers use Visual Studio 2012 to maintain a library of commercial .NET components provided for sale by your company.
You release new versions quarterly and provide support for the four most recent versions.
When issues are logged with previous versions it is time-consuming for your developers to locate and associate the correct version of debugging symbols and source code.
You need to streamline the process for debugging prior versions of your library.
What should you do?
Correct Answer: D Vote an answer
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server installed at a main office.
A TFS Proxy is installed at the branch office with a default port number.
You need to access TFS from the branch office to add and manage work items.
What should you do?
Correct Answer: A Vote an answer
You manage a geographically dispersed development team that uses the Microsoft Visual Studio Scrum 2.0 process template.
Each of the four locations has approximately six team members.
You need to optimize the team's performance to minimize the impact of the geographic dispersion.
What should you do?
Correct Answer: D Vote an answer
Your network environment is configured according to the following table:

---
Your TFS environment is configured with the following URLs:
TFS: http: //tfssrv: 8080/tfs
Reporting: http: //tfssrv/reports
SharePoint: http: //tfssrv/sites
You need to configure only the TFS URL to be the following fully qualified domain name (FQDN): http: //tfs.contoso.com.
You log on to the application-tier server. What should you do next?
Correct Answer: D Vote an answer
Your development team uses the Microsoft Solution Framework (MSF) for Agile Software Development 6.0 process template.
You need to determine the process to obtain the most accurate estimates for each user story in your product backlog.
What should you do?
Correct Answer: C Vote an answer
You are using Microsoft Test Manager (MTM). You have created some shared steps for a recurring test sequence.
You plan to use these shared steps with fast-forward playback in multiple test cases.
You need to create an action recording for the shared steps.
What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)
Correct Answer: B,D Vote an answer
DRAG DROP
Your team uses Microsoft Visual Studio Team Foundation Server (TFS). You use Team Foundation Build to plan your build infrastructure. You want to configure two separate servers to handle your build load.
Your team project contains ASP.NET MVC solutions. One solution needs a third-party control that can only be installed on a single build server. Your other solutions can be built on any build server. You plan to create a separate build definition for each solution.
You need to configure your build definitions so that builds are routed with the correct components to the server.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Correct Answer:
Your development team uses Scrum as its process framework.
You need to identify key metrics for measuring the effectiveness of any process changes.
Which three key metrics should you measure? (Each correct answer presents a complete solution. Choose three.)
Correct Answer: C,E,F Vote an answer
You are using Microsoft Test Manager (MTM). You are using the Microsoft Solution Framework (MSF) for Agile Software Development process template. SharePoint integration and reporting are enabled.
You want to assess your team's testing effort.
To do this, you need to:
Identify how much testing has the team completed,
Determine whether the team is likely to finish the testing on time,
Identify how many tests have passed, failed, or blocked, and
Identify how many tests are left to be run.
What should you do?
Correct Answer: D Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
DRAG DROP
You are a developer for Contoso, Ltd. The product owner sends an email with a list of requirements that need to be built out for your company's social media product.
You plan to use the list of requirements to create the Product Backlog. The development team will break these features into user stories.
You need to create a user story from a user's perspective in which the user accesses the contact history. Additionally, you need to document the action the user wants to take and the benefit the user will receive from that action.
Complete the user story. To answer, drag the appropriate component of the user story to the correct target. Each component of the user story may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Correct Answer:
You are using Microsoft Test Manager (MTM) to perform exploratory testing.
You need to insert an image into the comment area for the test run.
What are two possible ways to accomplish this goal? (Each correct answer presents a complete solution. Choose two.)
Correct Answer: A,C Vote an answer
Your network environment includes a Microsoft Visual Studio Team Foundation Server (TFS) 2012 server.
You need to be able to trace bugs to the code that addresses the bug.
What should you do?
Correct Answer: B Vote an answer