Free ISM INTE Practice Test & Real Exam Questions

  • Exam Code/Number: INTE
  • Exam Name/Title: Supply Management Integration
  • Certification Provider: ISM
  • Corresponding Certification: ISM CPSM
  • Exam Questions: 168
  • Updated On: Sep 29, 2026
If a shipment has a gross weight of 500 pounds and overall dimensions of 42 inches x 48 inches x 48 inches, what is the density of the shipment (in pounds per cubic foot)?
Correct Answer: D Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
Identifying risks is MOST associated with which of the following stages of a project?
Correct Answer: B Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
A company supply manager conducts a review of current freight contracts and finds that payments to the primary carrier for outbound shipments have been based on a published rate schedule, which is revised annually. The supply manager believes the shipping costs may be higher than necessary. In order to reduce outbound transportation costs, which of the following should the supply manager do FIRST'
Correct Answer: C Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
Which of the following are the quickest ways to ship food products in order to ensure they do not spoil?
Correct Answer: C Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
A company produces and distributes its products in the continental United States, mostly to customers located in metropolitan areas. The company conducts an ABC analysis to classify items, and determines that A and B items have variable demand, while C items have relatively stable demand. The logistics group wants to use this information to minimize transportation costs. Which of the following is the BEST combination of modes for the firm to use in order to minimize costs?
Correct Answer: D Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
A manufacturing firm is preparing a materials requirement plan for the next six weeks. The information is as follows:
Master Production Schedule
Week123456
Item A51015202530
Other Relevant Information
ItemItem's ParentItem's Lead TimeItem's Lot SizeItem's Current Inventory ANone1 weekLFL20 BA2 weeks105 CB3 weeks205 How many levels does the product structure have in the bill of materials?
Correct Answer: C Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
A firm hires a contractor to build a new warehouse. During construction, the firm decides it wants to modify the contract to add an office area to the facility. Which of the following is the BEST course of action for the firm to take in this situation?
Correct Answer: C Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
FGH, Inc. is a beverage manufacturer. FGH is having difficulty coordinating daily delivery requirements of bottles from Supplier X. Delivery schedules are set weekly, but often need to be changed. However, the supplier has otherwise established itself as reliable. In the hope of speeding up the replenishment process and reducing coordination efforts, FGH is prepared to share production and inventory information with Supplier X.
In this situation, which of the following should FGH implement with Supplier X?
Correct Answer: D Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
Based on the global reach and complexity of supply chains, resiliency planning and risk assessment are necessary because of which of the following'
Correct Answer: D Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
In preparation for a new product launch, a company reviews the production capabilities of several regional plants in comparison with anticipated demand. Plant A is expected to have the highest demand, but consistent supply of parts is less reliable there than in other locations. The firm locates a supplier near the plant, which, although qualified, currently does not have enough space to store the large volume of finished parts Plant A will need for production. However, this supplier plans to expand.
To support plant operations during new product ramp-up, which of the following is MOST likely to be effective?
Correct Answer: B Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
A supply manager oversees three distribution centers. Which of the following will be MOST useful for understanding the capacity of these centers7
Correct Answer: B Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
An organization purchases materials beyond current and anticipated requirements in expectation of a price increase or shortage, in the hope that it will profit from the sale of the materials at a later date. This describes which of the following buying strategies?
Correct Answer: B Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
An organization purchases material from several countries. These materials are assembled into products and sold in several other countries. This firm's product specifications will MOST likely reference
Correct Answer: D Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
A company introduces a new product line. Although the line is selling well, profit margins are barely at the break-even point. In this situation, which of the following is MOST likely to improve profit margins'
Correct Answer: A Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).