A customer needs high performance computing (HPC) and a small-scale solution with up to eight processors. The solution should also provide storage in a modular form factor. The customer's HPC application is designed so that some nodes act as compute nodes while others act as storage nodes that serve data to the compute nodes.
Which HPE Apollo system is most appropriate for this situation?
Correct Answer: B Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
An architect is planning an HPE Moonshot solution with m710p cartridges. The customer's application requires cartridge nodes to connect to a NAS. The customer's current infrastructure supports 10GbE. In the future, the customer plans to upgrade the fabric between the HPE Moonshot and the NAS solution to support 40GbE.
Which switch modules and uplink modules should the architect recommend to meet both the current and future needs?
Correct Answer: B Vote an answer
An architect needs to design a solution for a customer that stores all data on third-party NAS storage, and that does not yet have a database solution. The new HPE-based solution must be optimized for data mining.
How can the current data stored on the NAS be used for data mining?
Correct Answer: B Vote an answer
What is a basic assumption for an architect using the HPE Servers TCO calculator to justify a customer's migration away from a fully depreciated set of hardware?
Correct Answer: B Vote an answer
A customer purchases a hyperscale solution based on the HPE Moonshot platform and needs a management tool is suitable for this environment and meets the customer's needs?
Correct Answer: A Vote an answer
An architect explains a software-defined data center (SDDC) concept and its benefits to a customer. The customer indicates an interest and so the architect needs to verify whether the customer is ready to move to the SDDC.
Which additional information should the architect obtain from the customer to verify this?
Correct Answer: A Vote an answer
Under which Transformation Area do HPE Moonshot solutions with Citrix fail?
Correct Answer: B Vote an answer
HPE Moonshot 180G Switch Modules and HPE Moonshot 16-SFP+ Uplink ModulesA customer is planning to replace its DAS-based third-party server solution with an HPE BladeSystem solution using FlexFabric connected to an iSCSI based HPE StoreVirtual 3200.
Which method should the architect recommend for migrating data from the old system to the new system?
Correct Answer: A Vote an answer
A customer's business critical application server, which is managed by HPE OneView, recovered from an automatic ASR reboot. HPE Support requests an Active Health System log.
What should the customer use to access the log while the server is online?
Correct Answer: C Vote an answer
A customer recently purchased an HPE Moonshot chassis to host its internal website. Subsequently, the customer reports difficulties deploying new cartridges in an efficient manner. The customer suggests exchanging the solution for a more traditional server platform.
What can the architect demonstrate to the customer to help solve the problem while preserving the validity of the original design solution?