Free API API-1169 Practice Test & Real Exam Questions

  • Exam Code/Number: API-1169
  • Exam Name/Title: Pipeline Construction Inspector Exam
  • Certification Provider: API
  • Corresponding Certification: API Certification
  • Exam Questions: 453
  • Updated On: Jun 01, 2026
Prior to hydrostatic testing the owner/operator shall notify?
Correct Answer: C Vote an answer
During a strength test, the test pressure must be maintained for at least _______ hrs.
Standard and section?
Correct Answer: A Vote an answer
A miter joint on steel pipe to be operated at a stress of 30% of SMYS may not deflect the pipe more than _______ degrees.
Standard?
Correct Answer: A Vote an answer
Familiarization with the key parts of which of the following regs and practices will aid in safeguarding the env during a project?
-Maintenance of erosion, sediment and runoff controls
-Especially subpart A of the FWPCA local revegetation reqs
-Familiarity with NPDES reqs
Correct Answer: B Vote an answer
Calc the top width of a bell hole exc that is 8 ft deep and 6 ft wide. Soil C.
Correct Answer: D Vote an answer
_______________ Must be worn by personnel near arc welding and arc cutting with open arcs.
Correct Answer: C Vote an answer
In the event that an inspector notices a sheen on a navigable river, the inspector should immediately?
Correct Answer: D Vote an answer
Work Permits for excavation would be found under what OSHA standard?
Correct Answer: B Vote an answer
Standards for slope based on soil type
Correct Answer: B Vote an answer