Free API API-1169 Practice Test & Real Exam Questions
When an excavation is within _____ of a pipeline facility an OQ qualified representative shall be continuously present during all excavation and backfilling activities to ensure that criteria is being met.
Correct Answer: D
Vote an answer
If clean up and restoration cannot happen as required, maintain ____________.
Correct Answer: B
Vote an answer
Define validation in terms related related to data, information and document.
Correct Answer: C
Vote an answer
If the pressure changes in a pipe section, what other change is directly related to this pressure change?
-stress
-volume
-Temp
-Weight
-stress
-volume
-Temp
-Weight
Correct Answer: C
Vote an answer
Where can pipeline locating and marking requirements be found:
-API 1169
-API 1110
-Applicable CFRs
-B31.4/B21.8
-API 1169
-API 1110
-Applicable CFRs
-B31.4/B21.8
Correct Answer: D
Vote an answer
When nondestructive testing is required under §192.241(b), each operator must retain, for the life of the pipeline, a record showing by milepost, engineering station, or by geographic feature, the number of girth welds made, the number nondestructively tested, the number rejected, and the disposition of the rejects.
True or False?
True or False?
Correct Answer: C
Vote an answer