Free API API-1169 Practice Test & Real Exam Questions

  • Exam Code/Number: API-1169
  • Exam Name/Title: Pipeline Construction Inspector Exam
  • Certification Provider: API
  • Corresponding Certification: API Certification
  • Exam Questions: 453
  • Updated On: Jun 01, 2026
The quality management system documentation shall include?
Correct Answer: A Vote an answer
Soil that remains in clumps
Correct Answer: D Vote an answer
Soil is in condition where cave-in is imminent or is likely to occur. Evidence by fissures, slumps or loose material rolling down.
Correct Answer: A Vote an answer
How is pipe stationing typically shown?
-10s of feet with add ft as 0s
-10s of feet with add ft shown as pluses
-100s of feet with add shown as zeros
-100s of feet with add shown as pulses
Correct Answer: B Vote an answer
_______________ can be used to compensate for displaced tide-water.
Correct Answer: B Vote an answer
Inspecting and ensuring the maintenance of temporary erosion control
measures at least:
a. on a _______ basis in areas of active construction or equipment
operation;
b. on a ________ basis in areas with no construction or equipment
operation; and
c. within _________ of each 0.5 inch of rainfall
Correct Answer: C Vote an answer
For welder qualification, the specimens shall be prepared for tensile-strenght, nick-break, and bend tests. When tensile-strength tests are omitted:
Correct Answer: D Vote an answer
During welding procedure qualification in accordance with API 1104, if the required tensile specimens break outside the world and heat affected zone they shall be?
Correct Answer: C Vote an answer
Trench ratio for soil type C
Correct Answer: C Vote an answer