What changes to logic would eliminate Activity B from the critical path?
Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
In its simplest form, what is the main drawback of critical path method scheduling?
Correct Answer: A
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
At the end of month one, did the delay to the parking structure foundation delay the project?
Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
Using the "crashed" schedule, if you start Activity 2002 on August 12, 2001, what is the finish date for Activity 2002?


Correct Answer: D
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
Activity 2003 started during the current reporting period and proceeded as planned with the normal schedule. If the remaining duration at the end of this period is ten workdays, then what is the earned value assignable to Activity 2003 in the pay estimate for this reporting period?
Correct Answer: A
Vote an answer
In order for a claimant to be entitled to an extension of contract time for a delay event (and further to be considered compensable):
Correct Answer: D
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
Scenario: You are providing construction management services for a small office building project. Your duties include reviewing and approving the contractor's baseline schedule. The contractor has submitted the first baseline schedule for the project.
The contractor subsequently submits a CPM schedule for its baseline schedule submittal. As part of your review, you look at the durations for each activity in the schedule. How do you determine if a duration of 10 work days for drywall installation is accurate?
The contractor subsequently submits a CPM schedule for its baseline schedule submittal. As part of your review, you look at the durations for each activity in the schedule. How do you determine if a duration of 10 work days for drywall installation is accurate?
Correct Answer: B
Vote an answer
Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?


Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
At a minimum, periodic reporting must be done at what interval?
Correct Answer: A
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).
Using the normal schedule, what is the owner's total cost of the project?
Correct Answer: C
Vote an answer
Explanation: Only visible for Pass4Leader members. You can sign-up / login (it's free).